Phase BU-1A Burlington Colton Avenue Bridge Replacement is out for construction bids

February 14, 2019

Phase BU-1A Burlington Colton Avenue Bridge Replacement has been put out for construction bids. Bids will be publicly opened on March 5, 2019, at the Burlington City Hall. The full advertisement for bids can be viewed here https://www.mouseriverplan.com/phase-bu-1-city-of-burlington 

 

Please reload

Featured Posts

Mouse River Enhanced Flood Protection Project (MREFPP) Announces 16th Street Opening

December 12, 2019

Minot, N.D. – As work winds down for the winter on MI-2 and MI-3 of the Mouse River Enhanced Flood Protection Project (MREFPP), a major traffic change...

1/10
Please reload

Recent Posts
Please reload

© 2019 SOURIS RIVER JOINT BOARD

  • YouTube Channel
  • Facebook - White Circle