HOME
NEWS
ABOUT THE PROJECT
URBAN
RURAL
LEVEE REPAIRS
FLOOD INSURANCE
LIBRARY
CONTACT
MORE
Introduction Letter
Narrative
Appendix A - Project Plans
Appendix B - Project Schedule
Appendix C - Project Opinion of Probable Cost
Appendix D - Project Benefit - Cost Analysis
2019 BUILD Info Form
BCA Model
North Dakota Congressional Delegation
North Dakota Governor Doug Burgum
North Dakota Department of Transportation
City of Minot
Souris River Joint Board
Minot Air Force Base
Assiniboine River Basin Initiative
Minot Area Development Corporation
Minot Area Chamber of Commerce
Ward County
Ref. 1 - Rail Flood Resiliency Memo
Ref. 2 - USGS Stochastic Hydrology
Ref. 3 - BNSF Freight Traffic
Ref. 4 - Mouse River Enhanced Flood Protection Project
Ref. 5 - HB 1020 65th ND Legislative Assembly
Ref. 6 - SB 2020 66th ND Legislative Assembly
Ref. 7 - ND State Water Commission Minutes
Ref. 8 - Minot CDBG-NDR Action Plan
Ref. 9 - 3rd Street Bridge Structure Inventory
Ref. 10 - NDDOT Design Manual
Ref. 11 - 3rd Street Crash Data
Ref. 12 - ND State Safety Plan
Ref. 13 - Minot Opportunity Zone
Ref. 14 - MREFPP Programmatic EIS
Ref. 15 - USACE Record of Decision
Ref. 16 - Minot Brownfields Plan
Ref. 17 - Minot Riverfront and Center
Ref. 18 - ND Water Development Plan
Ref. 19 - USACE Chief's Report
Ref. 20 - FEMA CLOMR
Ref. 21 - IJC/ISRB Plan of Study
Ref. 22 - BNSF Rail Elevations
Ref. 23 - Minot Anne Street Bridge Rehabilitation
Ref. 24 - Minot Water Treatment Plant HMGP Project
Ref. 25 - MREFPP Phase MI-1: 4th Avenue Floodwall
Ref. 26 - MREFPP Phase MI-2/3: Napa Valley and Forest Road Levees
Ref. 27 - MREFPP Phase MI-4: Maple Diversion
Ref. 28 - MREFPP Phase MI-5: Northeast Tieback Levee
Ref. 29 - MREFPP Phase WC-1: Tierrecita Vallejo Levee
Ref. 30 - City of Minot Acquisition Status
Ref. 31 - 2011 Flood Damages
© 2024 SOURIS RIVER JOINT BOARD