top of page

Mouse River Enhanced Flood Protection Project VE-1 Velva Bridge Replacement Project and RC-1 Mouse R

  • Writer: Ackerman Estvold
    Ackerman Estvold
  • Jul 1, 2020
  • 1 min read

Minot, N.D. – Public information meetings for two phases of the Mouse River Enhanced Flood Protection Project that were previously postponed due to COVID-19 have been re-scheduled. The public information meetings are sponsored by the Souris River Joint Board and will include an open house and a formal presentation by project engineers. The meetings will provide information to neighborhood property owners and community members regarding the current design plans, potential traffic impacts and proposed detour routes, and information about what the community can expect as the project progresses.

Meeting details for both phases are outlined here:

Phase VE-1 Velva Bridge Replacement

Wednesday, July 29, 2020

6:30pm Open House

7:00pm Formal Presentation

Location: Velva School Gym (101 4th St W Velva, ND)

Phase RC-1 Mouse River Park Bridge Replacement

Thursday, July 30, 2020

6:30pm Open House

7:00pm Formal Presentation

Location: Mohall Community Center (807 Highway 5 East Mohall, ND)

For more information about the Mouse River Enhanced Flood Protection Project, visit www.mouseriverplan.com, or visit us on Facebook at Mouse River Plan.

Comments


Recent Posts

© 2025 SOURIS RIVER JOINT BOARD

Contact Us
Submit your information if you have questions, or would like to share comments or feedback regarding the project.

  • YouTube Channel
  • Facebook - White Circle

Success! Message received.

bottom of page